To follow up on your questions from yesterday, we have contacted the lab for an explanation of the differences/accuracy of the two testing methods for Perchlorate that have been used for the project.
Second, with respect to 65, 91, and 110 Groton Road sampling, both 65 and 110 are scheduled to be sampled annually, which occurs during September of each year. I've attached the sampling matrix, as determined by CEI, which is the schedule we follow (under "Proposed Residential Sampling Program"). As for 91 Groton Road, they are scheduled to sampled on a quarterly basis. After reviewing our scheduling letters, this residence was included in the mailing for June.
Thank you for your attention to this matter. Let us know if you have any questions or require any additional information.
Thanks,
Ray
Raymond L. Willis, III, P.E.
Vice President
IMPORTANT NOTICE
This message is intended only for the designated recipient and is a confidential communication. The information contained in this email should not be copied, modified, retransmitted, or used for any purpose without Onsite Engineering's written authorization. If you are not the intended recipient, you are hereby notified that you have received this message in error and the review, use, distribution or dissemination of this message is prohibited. Kindly notify the sender of the error by replying to this message and deleting it from your system. Thank you.
|